RAILWAY EQUIPMENT
Contact
Newsletter
News
MR 2000 – MR 2000 EP

05/04/2019 It is available the Buffer handling device MR 2000 and MR 2000 EP, a handy light equipment to dismount, handle and mount buffer from locomotives, coaches or wagons. You can see its technical characteristics on “Railway equipment” page.


PUC 600 – PUC 1000

04/04/2019 It is available the Bearing Universal Press PUC 600 and PUC 1000, a semi-automatic machine to assemble and disassemble bearings or TBU from/to the axles for maintenance You can see its technical characteristics on “Railway equipment” page.


Axe - Sickle and wooden sleepers adze

Axe

Model Axe Weight Kg from 0,4 to 1,2

Rail chisel

Tool with wooden handle and steel head, used mainly to remove the excess of aluminothermic welding from the rails. Avaible version 4 Kg. Model   Rail chisel       Weight kg 1,5            

Sickle

Tool made up of a wooden handle and blade in hardned steel, used for cutting off the vegetation along the railway line. Available in different versions with right or left handle. Model   Sickle       Weight kg 1,25            

Wooden sleepers adze

Our wooden sleepers adze is manufactured in high quality forged steel and is specifically designed for sabotage the sleepers. Available in two different versions.   Model   Wooden sleepers adze       Weight kg 1  / 0,8              

Name*
Phone*
Email*
Message
Request a quote:
Detailed technical information:
Request both: